Most backup-power disappointments start with the same mistake: buying equipment before anyone has written down what it needs to power. Sizing is mostly arithmetic and honesty about your priorities. This primer walks through the logic in the order a careful planner would use it. It is general education, not a design for your specific home.
1. Decide what actually needs power
FEMA’s outage guidance starts in the same place: take an inventory of the things in your home that rely on electricity. Split that list into three tiers:
- Critical: anything health- or safety-related, plus communication (phone charging, a radio, a router).
- Important: refrigeration, a few lights, a fan or a furnace blower.
- Nice to have: everything else.
A system designed for tier one and part of tier two is far smaller, cheaper and safer than one that tries to run a whole house.
2. Turn the list into watt-hours
For each device, multiply its running watts by the hours per day you expect to use it. A 10 W router running 24 hours uses about 240 Wh; four 9 W LED bulbs for 5 hours use about 180 Wh. Add the totals to get a daily energy figure. Use the nameplate or a plug-in power meter rather than guesses, and remember that some devices (refrigerators, pumps) cycle on and off.
3. Check peak and surge power separately
Energy (watt-hours) tells you how big the battery must be; power (watts) tells you how big the inverter must be. Motors can draw several times their running watts for a moment when they start. Your inverter needs to handle the largest combination of loads that could run together, including those start-up surges.
4. Convert to usable battery capacity
Battery labels show nominal capacity, but you never get all of it. Depth-of-discharge limits, inverter losses and temperature all reduce what is usable, and different chemistries tolerate deep discharge differently (see our chemistry comparison). Planners therefore divide the daily energy figure by a conservative usable fraction and then multiply by the number of days of autonomy they want.
5. Add margin, then plan the protection
Once you have a target, the rest of the design follows: cable sizes, fuses and breakers, a battery management system for lithium packs, and ventilation. The U.S. Department of Energy’s overview of balance-of-system equipment is a good reminder that batteries are only one part of the bill.
Where Last Battery fits
Last Battery’s Watt-Stacking Tradecraft Manual is built around this kind of load planning and system sizing, alongside configurations, inverters, BMS and wiring layout. If you want a structured, beginner-friendly walkthrough, read our Watt-Stacking focus area. Anything that ties into your home wiring should be reviewed by a licensed electrician.